We are starting to power up racks on a 1 by 1 basis.
Dear All.
Power to Suite A and B has been restored, fed from the new infrastucture. Racks are being powered on 1 by 1 to prevent an in-rush current. All services should resume within 15-30 minutes. I will issue an all-clear once all racks are powered on.
Regards,
Rob Bentley
SynergyWorks Internet
www.synergyworks.co.uk